© 2017 by AACP Infrastructure Systems Pvt. Ltd. All Rights Reserved.

 

Created by Uma Maheshwar Reddy

  • Facebook - Black Circle
  • LinkedIn - Black Circle
CATEGORIES

Compound Wall Construction at BOSCH Devarachikkinhalli

October 1, 2019

 

Client: BOSCH.

 

PMC: FABS

 

Nature of Work: Size Stone Masonry & Chain Link Fencing

 

BOSCH developing it's training facility at Devarachickinhalli has given us an order for the dismantling and rectification of the existing compound wall constructed using size stone masonry. In addition to this chainlink fencing will have to be fabricated on top of the reconstructed compound wall. We look forward to continuing our relationship with BOSCH by helping develop another one of their facilities.

 

 

 

Share on Facebook
Share on Twitter
Please reload

Please reload