CATEGORIES

Toyota Kirloskar Auto Parts (TKAP): Roads, Drains & Site Reclaimation

April 30, 2017

Client: Toyota Kirloskar Auto Parts (TKAP)

Nature of Work: Roads, Drains and Site Reclamation

 

The site reclamation carried out for Toyota Kirloskar Auto Parts Manufacturing plant required borrowing of soil from outside the factory premises and using the borrowed soil to fill up layers upto a height of about 12m.

About 2.5 Km of roads were laid and necessary drainage was provided inside the factory premises.

 

Share on Facebook
Share on Twitter
Please reload

Please reload

© 2017 by AACP Infrastructure Systems Pvt. Ltd. All Rights Reserved.

 

Created by Uma Maheshwar Reddy

  • Facebook - Black Circle
  • LinkedIn - Black Circle