Pond Modification & Spillway Works at Toyota Kirloskar Auto Parts (TKAP)

April 30, 2017

Client: Toyota Kirloskar Auto Parts (TKAP)

Nature of Work: Earth Work, Dismantling & Concrete Works

 

An existing Rain Water Harvesting Pond in need of modification required about 3000 cum of earthworks, concreting, rubble masonry, dismantling worn out concrete works and laying pipes. The Pond helps save TKAP considerable expenditure on water resources and and reuse existing water, thus helping their bottom line. 

 