Land reclamation was carried out on about 100 Acres of undulated land to specified levels for the BOSCH manufacturing plant currently being set up in Bidadi Industrial. The difference between the topmost and the bottommost point being 14m required cutting and filling of about 550000 m3 of soil followed by multiple layers of compaction.

In line with our corporate social responsibility goals, we enacted risk management protocols to protect the wildlife such as snakes and other animals.