ABB UG Tank & Pump Room Construction

Project slide 1
Project slide 2
Project slide 3
Project slide 4

Project Details :

Project Year: 2026

Client: ABB India Limited

Location: ABB India Limited, Disha - 3rd Floor, Plot No.5 & 6, 2nd Stage, Peenya Industrial Area IV, Peenya 560058, Bangalore, Karnataka

Project Type: Civil and MEP Works

Scope: UG Tank Construction, Pump Room, Electrical & Plumbing Works

Status: Completed

AACP Infrastructure Systems Pvt. Ltd. successfully completed the construction of an underground water storage tank and pump room facility at ABB India Limited's Peenya facility. This comprehensive Civil and MEP project showcased our enhanced capabilities in PHE (Public Health Engineering) and electrical works, executed within a live industrial environment.

Project Overview:

Complete construction of an underground water storage tank and pump room, along with all associated electrical connections and plumbing systems. This project significantly improved our capabilities to carry out PHE and electrical works at an industrial scale.

Scope of Work:

  • Underground tank construction with waterproofing
  • Pump room civil construction
  • Complete electrical panel installation and wiring
  • Plumbing network integration with existing facility
  • Automatic pumping system installation
  • Special flange connections for precise fittings
  • Execution in Live Industrial Environment:

    The project was executed within a live industry, requiring meticulous planning and coordination. Transitioning from the old connection system to the new infrastructure involved carrying out critical shutdown works, ensuring the facility was never left without water supply during the switchover.

    Key Features:

  • Automatic pumping systems for efficient water distribution
  • Special flanges engineered for precise connections
  • Complete electrical panel installation and wiring
  • Zero-downtime transition through careful shutdown management
  • Integrated plumbing network with existing facility infrastructure
  • Outcome & Value Delivered:

  • Enhanced water storage and distribution infrastructure
  • Seamless transition from old to new systems
  • Demonstrated PHE and electrical capabilities
  • Safe execution in live industrial environment
  • Reliable automatic pumping for continuous operations
  • This project marks a significant milestone for AACP Infrastructure, demonstrating our expanded capabilities in Civil and MEP works including PHE and electrical systems. The successful execution within a live industrial environment, with zero-downtime transition, reflects our commitment to delivering quality infrastructure solutions.

    Project Gallery

    ABB UG Tank & Pump Room Construction image 1
    ABB UG Tank & Pump Room Construction image 2
    ABB UG Tank & Pump Room Construction image 3
    ABB UG Tank & Pump Room Construction image 4
    ABB UG Tank & Pump Room Construction image 5
    ABB UG Tank & Pump Room Construction image 6
    ABB UG Tank & Pump Room Construction image 7
    ABB UG Tank & Pump Room Construction image 8
    ABB UG Tank & Pump Room Construction image 9
    ABB UG Tank & Pump Room Construction image 10
    ABB UG Tank & Pump Room Construction image 11
    ABB UG Tank & Pump Room Construction image 12
    ABB UG Tank & Pump Room Construction image 13
    ABB UG Tank & Pump Room Construction image 14
    ABB UG Tank & Pump Room Construction image 15
    ABB UG Tank & Pump Room Construction image 16
    ABB UG Tank & Pump Room Construction image 17
    ABB UG Tank & Pump Room Construction image 18
    ABB UG Tank & Pump Room Construction image 19
    BrochureAACP Infrastructure | Civil Construction & Infrastructure Development