Structural Steel Strengthening & Tie Beam Works – Bosch IT Buildings Adugodi
Project Details :
Project Year: 2025
Client: Bosch
Location: Adugodi, Bangalore, Karnataka, India
Facility: BAN103–BAN600 | Beyond Phase-2 New IT Buildings
Project Type: Structural Steel Strengthening Works
Scope: Tie beam fabrication, erection, testing, and quality-controlled installation
Status: Completed
AACP Infrastructure Systems Pvt. Ltd. executed structural steel fabrication and strengthening works for the existing Pre-Engineered Building (PEB) structures at Bosch’s Beyond Phase-2 IT campus in Adugodi, Bangalore. The objective was to enhance overall structural integrity through continuous tie beam installation across the buildings.
Project Overview:
The works were executed within an operational IT campus, demanding strict adherence to safety, quality, and execution standards. The project was carried out under close inspection, meeting Bosch’s rigorous engineering and quality benchmarks for critical structural interventions.
Scope of Work:
Access Methodology & Safe Erection Strategy:
Tie-beam areas:
Mezzanine areas:
Engineering & Quality Excellence:
Approximately 40 MT of structural steel was executed under stringent quality control procedures.
Execution Challenges & Solutions:
Strengthening an existing PEB structure within a live facility required phased planning, controlled access equipment, precision fabrication, and rigorous inspection protocols to ensure seamless execution.
Outcome & Value Delivered:
This project reflects AACP Infrastructure’s capability in executing quality-critical structural steel strengthening works within live industrial environments, delivering durable, compliant, and safety-driven engineering solutions.
Project Gallery



