Rain Water Harvesting Conveyance System
Project Details :
Project Year: 2021
Client: Transystem Logistics International (TLI)
Nature of Work: Earthwork, Civil Works, Mechanical, etc..
Stormwater conveyance systems.
We have been approached by TLI to help sort out a water conveyance problem.
Problem Identification:
As per the original design the rain water after filling up the RWH tank was supposed to drain out. but instead the water would log filling up the entire drain connecting the RWH tank.
Solution and Engineering Intervention:
On critical analysis we were able to provide an efficient and cost effective solution to reroute the water by using a combination of drains & sluice gates.
Water management was strengthened.
Project Gallery